Getting a Generator Ready Before Winter in Fond du Lac: What Should It Power, and How Does It Hook Up?
Before winter, decide which circuits your Fond du Lac generator must run, then have an electrician plan the hookup through a transfer switch, never through a wall outlet. Do both before the first ice storm, because the load list sets the generator size and the hookup has to be planned, permitted and tested ahead of time.
Couillard Electric plans and installs standby generators and hookups for homes in Fond du Lac. The questions that decide the work are what has to stay on, how the unit connects, and where it sits.
What should a generator power in a Wisconsin winter?
Start with what protects the house, then add comfort. Most Fond du Lac homes put these first:
- Furnace or boiler. A gas furnace still needs electricity for the blower, controls and igniter. No power, no heat.
- Sump pump. A January thaw on frozen ground can fill a pit fast.
- Refrigerator and freezer. Spoiled food is the most common outage loss.
- Well pump. On a private well, no power means no water.
- A few lights and a kitchen outlet. Enough to see, charge phones and make coffee.
- Powered medical equipment. If anyone depends on it, it goes at the top.
Then decide on extras like a garage door opener, an electric water heater, a second freezer or a home office. Each one adds to the size you need.
Why make the list before buying a generator?
Because the list decides the size, not the other way around. We Energies' generator safety guidance says generators must be sized to handle starting wattage, which is higher than the running wattage printed on most appliances. A furnace blower, a well pump and a sump pump all pull extra for a moment when they start. If those starts land together on a generator that's too small, something drops off. A written list lets an electrician add up real numbers so you don't buy too little or pay for capacity you won't use.
How does the hookup get planned?
The safe connection is a transfer switch installed by a licensed electrician, not a cord plugged into a wall outlet. We Energies says portable generators are not designed to be connected to house wiring, and that a transfer switch is the only safe way to connect a generator to existing wiring. The switch keeps house circuits separated from the utility lines, which protects line crews working an outage, and it lets you run hardwired loads like a furnace or well pump without extension cords.
The full hookup options, and the surge protection that often belongs in the same project, are in our guide to winter power outages, generators and surge protection. This post stays on the load list and the planning that has to happen before the unit is in place.
If you already own a portable generator, our post on portable generator hookups with an inlet and interlock covers that route. For a permanent unit with an automatic transfer switch, see standby generator winter prep. Either way, the hookup has to be planned, permitted and tested ahead of time, not during the storm.
Where should the generator sit?
Outside, away from the house. Ready.gov says generators and fuel should always be used outdoors and at least 20 feet away from windows, doors and attached garages. We Energies says never use a generator inside a home, garage, crawlspace, shed or other enclosed area. Keep working carbon monoxide alarms inside. A standby unit gets a fixed, planned spot on a pad, which is one more reason to sort out the layout before snow is on the ground.
What if I already have a generator?
A unit that sits all year needs attention before the first storm. Follow the manufacturer's service schedule, keep the area around a standby unit clear of leaves and snow, and make sure it runs its exercise cycle. For a portable, run it under a light load outdoors and confirm your cord or inlet is in good shape. Our generator maintenance checklist walks through the rest.
What affects the cost of a generator setup?
We don't publish prices, because every house is different. What moves the cost is the size the load list calls for, natural gas or propane, how far the unit sits from the panel and fuel supply, whether the panel needs work, and whether you choose a portable with an inlet or a standby with an automatic transfer switch. Our generator installation cost guide explains each of these factors. We look at the house first and explain the options and the price before any work starts.
What's the next step?
Write down the loads you'd want on during a three-day outage. Mark anything with a motor: furnace, pumps, freezer. That list makes the first conversation quick.
Couillard Electric works Monday through Friday, 8 a.m. to 4 p.m. Call (262) 618-2851 or contact us to plan a generator load list and hookup for your Fond du Lac home.