Couillard Electric LLC

Panel Upgrades & Service Changes

Modernize your electrical panel for improved safety, capacity, and code compliance.

Why You Need This Service

Older electrical panels often can't handle the power demands of modern homes and businesses. Frequent circuit breaker trips, outdated fuse boxes, insufficient amperage for new appliances or equipment, or non-compliant panels are all signs you may need an upgrade. Panel upgrades and service changes not only improve safety and functionality but are often required for adding major appliances, home additions, or passing home inspections.

What's Included

Complete panel replacement with modern circuit breakers
Service upgrade from 100A to 200A (or higher)
Meter base and service entrance upgrades
Grounding and bonding system verification
Coordination with utility company
All permits and inspections
Surge protection options
Labeling and documentation of new panel

Typical Project Scope

Panel upgrades typically involve replacing an outdated panel with a new, larger capacity panel and associated service entrance equipment. Service changes may also require upgrading the meter base and coordinating a temporary power outage with the utility company. The entire process usually takes 1-2 days, including permit processing, utility coordination, installation, and final inspection.

Our Process

1

Assessment & Planning

We evaluate your current electrical system, determine the right panel size and service capacity, and create a detailed plan.

2

Permits & Utility Coordination

We obtain electrical permits and coordinate with your utility company for any necessary service disconnection.

3

Panel Installation

We safely remove the old panel, install the new panel and service entrance equipment, and reconnect all circuits.

4

Testing & Inspection

We thoroughly test the new panel, verify all circuits, and schedule the required municipal inspection.

5

Final Documentation

We provide you with panel labeling, circuit directory, permit documentation, and warranty information.

Frequently Asked Questions

How do I know if I need a panel upgrade?

Common signs include frequently tripping breakers, a fuse box instead of a breaker panel, a panel rated at 100 amps or less, visible corrosion or rust on the panel, or plans to add major appliances like an EV charger, hot tub, or central AC. If your home was built before 1990 and has never had a panel upgrade, it's worth having us assess it.

How long does a panel upgrade take?

Most panel upgrades are completed in one day. A straightforward 100A to 200A upgrade typically takes 6-8 hours. If the service entrance or meter base also needs replacement, or if utility coordination requires scheduling, the project may span two days.

Will I lose power during the panel upgrade?

Yes, power will need to be shut off during the panel swap, typically for 4-6 hours. We coordinate with We Energies or your local utility to schedule the disconnection. We recommend planning for the outage and can advise on how to prepare.

How much does a 200 amp panel upgrade cost in Wisconsin?

A 200 amp panel upgrade in Wisconsin typically costs between $2,000 and $4,000, depending on the complexity of the installation and whether the meter base or service entrance also needs to be replaced. We provide a detailed written estimate before beginning any work.

Ready to Get Started?

Contact Couillard Electric today for professional, code-compliant electrical work.

Chat with Vera